Public Meeting for the Martin Luther King Jr. Blvd Resurfacing project.

The City of Cleveland invites you to a PUBLIC MEETING for the Martin Luther King Jr. Blvd Resurfacing project.

When: Wednesday, January 15, 2014 Time: 6:30 P.M.
Where: Our Lady of peace Catholic Church (12601 Shaker Blvd, Cleveland, OH 44120)
What: The purpose of this meeting is to present the Martin Luther King Jr. Blvd. Resurfacing plan to the public, and to gather public input on that plan. The project limits are Buckingham Ave. to Cedar Ave. The project includes resurfacing, spot pavement base repairs, spot sidewalk repairs, spot curb repairs, spot driveway repairs, and new ADA compliant curb ramps. Resurfacing between Mt. Overlook Ave. and Fairhill Rd. will be performed with the NEORSD sewer separation project scheduled for construction in 2015. This project also includes the construction of a rock fall fence on the east side of Martin Luther King Jr. Blvd, between North Park and Ambleside, as well as a barrier system to protect against falling rock. Six (6) foot bicycle lanes between Buckingham and Fairhill Road will be included with the final striping. The existing three lane sections in the northbound and southbound directions will be converted to two lane sections in order to provide for the bicycle lanes.

Why: Once your input is received, we will prepare the final Construction Plans. The Construction Plan will be presented at a future public meeting.

Advertisements

Comments are closed.